View Issue Details

IDProjectCategoryView StatusLast Update
0001352K18X001.00 SKB SWANHWpublic2021-12-28 18:50
Reporter(PM) Sheila Tu Assigned To(ALTech) SH Son Due Date2021-09-24 00:03
PrioritynormalSeveritys2-severeReproducibilityhave not tried
Status closedResolutionfixed 
Summary0001352: Mechanical changing list
DescriptionHi SH,

I moved the mechanical changing list to here for tracking.
SWAN is going to MP. From my point of view, I really don't suggest that parties control the materials such as what parties did in NPI stage.
Please help to work with us to control it in advance.
Otherwise, factory will be confused about what kinds of materials that they shall use and make the mistake as what ALT complained before.

Please check the changing timing and q'ty.
We'll follow your decision to issue EC so that it will make our factory to have the correct material information and usage.
TagsNo tags attached.
Attach Tags

Users monitoring this issue

Activities

(PM) Sheila Tu

2021-09-16 00:13

developer  

(ALTech) SH Son

2021-09-16 13:58

developer   ~0008237

Here is my feedback.

if you have any question, please comment it.

(PM) Sheila Tu

2021-09-17 21:03

developer   ~0008259

Hi SH,

About 'sub assembly (SPONGE_MIC_SILICON_140X24+adhesive tape)', may I know when is ALT's target to apply?

Besides, may I have your help to provide the drawing(or list down the mantis number) of below items for tracking? Thank you.
1. sub assembly (HOLDER MIC+adhesive tape)
2. sub assembly (bracket side led right+gasket_A+gasket_b)
3. sub assembly (bracket side led left+gasket_A+gasket_b)
4. CABLE INT WIRE HARNESS 175/325+5mm with ferrite core RED/BLACK GP
5. CABLE INT WIRE HARNESS 290/440+5mm with ferrite core RED/BLACK GP

(ALTech) SH Son

2021-09-24 13:59

developer   ~0008282

Last edited: 2021-09-24 14:02

Hi Sheila Tu
  0001352:0008259


sub assembly (SPONGE_MIC_SILICON_140X24+adhesive tape)
 :as we before discuss it, basically this is impossible for pre assembly due to silicon oil.
I'm looking at alternatives but, It's not confirmed.

1. sub assembly (HOLDER MIC+adhesive tape)
2. sub assembly (bracket side led right+gasket_A+gasket_b)
3. sub assembly (bracket side led left+gasket_A+gasket_b)
 -> the drawings will upload within today (9/24). but not this ticket.

4. CABLE INT WIRE HARNESS 175/325+5mm with ferrite core RED/BLACK GP
5. CABLE INT WIRE HARNESS 290/440+5mm with ferrite core RED/BLACK GP
-> ferrite core is under evaluating now, will update to Foxconn side.
 this cable will be applied after 15K production.

Thanks
SON

(ALTech) SH Son

2021-09-25 09:57

developer   ~0008289

I update the
sub assembly drawings 0001356:0008288

(SW) Jacky Chiang

2021-12-28 18:50

manager   ~0009152

Will track it by other ticket.

Issue History

Date Modified Username Field Change
2021-09-16 00:13 (PM) Sheila Tu New Issue
2021-09-16 00:13 (PM) Sheila Tu Status new => assigned
2021-09-16 00:13 (PM) Sheila Tu Assigned To => (ALTech) SH Son
2021-09-16 00:13 (PM) Sheila Tu File Added: SWAN_mechanical_component_list_210915.xlsx
2021-09-16 00:14 (PM) Sheila Tu Issue Monitored: (HW) Sean Chiang
2021-09-16 00:14 (PM) Sheila Tu Issue Monitored: (RD) Jim Chen
2021-09-16 00:14 (PM) Sheila Tu Issue Monitored: (PM) Carey Lu
2021-09-16 00:14 (PM) Sheila Tu Issue Monitored: (ALTech) Sophie Lee
2021-09-16 00:15 (PM) Sheila Tu Issue Monitored: (ALTech) SY Yoon
2021-09-16 00:15 (PM) Sheila Tu Issue Monitored: (PM) Tiffanie Lai
2021-09-16 00:16 (PM) Sheila Tu Issue Monitored: (ALTech) Jewoo Lee
2021-09-16 00:17 (PM) Sheila Tu Description Updated
2021-09-16 13:57 (ALTech) SH Son Issue End Monitor: (ALTech) Jewoo Lee
2021-09-16 13:58 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2021-09-16 13:58 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2021-09-16 13:58 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2021-09-16 13:58 (ALTech) SH Son Issue Monitored: (ALTech) Sun Choul Joung
2021-09-16 13:58 (ALTech) SH Son File Added: SWAN_mechanical_component_list_210915_ALT Feedback.xlsx
2021-09-16 13:58 (ALTech) SH Son Note Added: 0008237
2021-09-17 21:03 (PM) Sheila Tu Note Added: 0008259
2021-09-24 13:59 (ALTech) SH Son Note Added: 0008282
2021-09-24 14:02 (ALTech) SH Son Note Edited: 0008282
2021-09-25 09:57 (ALTech) SH Son Note Added: 0008289
2021-12-28 18:50 (SW) Jacky Chiang Status assigned => closed
2021-12-28 18:50 (SW) Jacky Chiang Resolution open => fixed
2021-12-28 18:50 (SW) Jacky Chiang Note Added: 0009152